La Paz, Baja California Sur — 2025
100 tons of product storage capacity; rack with three hermetic reciprocating compressors; R-449A refrigerant; dairy room temperature of 2°C; dock temperature of 5°C.
Construction of an 11.6-ton steel structure and 2,550 m² of insulated cold-room panels.

Culiacán, Sinaloa — 2024
Two -22°C storage rooms with 1,250 pallet positions, two -22°C storage rooms
with 950 pallet positions, four blast freezers, and a
6°C temperature-controlled dock with eight bays.

Monterrey, Nuevo León — 2023
Installation of a logistics facility for frozen product storage with 390 tons
of refrigeration capacity, including two low-temperature rooms totaling 2,000 m², one medium-temperature room of 700 m², and a 1,400 m² refrigerated loading dock. The system uses natural CO₂ refrigerant, booster technology, and adiabatic gas coolers.

Mexico City — 2020
Cold-room construction consisting of 100 tons of steel structure and 20,000 m²
of insulated panels, with a transcritical refrigeration system operating on
natural CO₂ refrigerant.


Chihuahua, Chihuahua — 2019
Product distribution center serving convenience stores



